22 / 27 · Development timeline

Current slide

The plan

Development timeline

Phase 0

Concept definition

Months 0–3

  • Agent selection and performance targets per model
  • Fire-service advisory panel and use-case validation
  • Regulatory and standards mapping

Phase 1

Engineering & bench prototypes

Months 3–9

  • Shell, chamber and dispersal design
  • Non-explosive release mechanism bench tests
  • First S and R scale prototypes

Phase 2

Live fire testing

Months 9–18

  • Instrumented burn tests with a partner training centre
  • Cooling and re-ignition performance measurement
  • X and WILD prototypes, drone placement trials

Phase 3

Certification & field trials

Months 18–30

  • Independent test-house certification programme
  • Operational trials with volunteer fire services
  • Manufacturing and tooling readiness

Phase 4

Production & AIR programme

Months 30+

  • First production run of S, R and X
  • Aerial deployment programme with aviation partners
  • Distribution into fire services and agencies

Planning assumption only — phase durations to be confirmed against supplier, test facility and certification lead times.

QuenchPod™ — Concept-stage technology22 / 27
Elapsed00:00:00

Next

Defensibility

Protect the architecture. Retire the risks.

IP roadmap

  • Priority filing before any further public disclosure
  • Novelty and freedom-to-operate search after filing
  • PCT filing at 12 months and selected national phases at 30 months
  • Trade marks for QuenchPod™, Network™ and Clicker™; design registrations for visible hardware

Certification takes longer or costs more

Engage the test house during Phase 1 and reuse evidence across the common platform.

Agent partner will not warrant the charge

Develop with a certified formulation partner from the first bench programme.

Dense thrown-device prior art

Anchor claims to the physical discharge architecture, installed system and control layer.

Conservative procurement cycles

Lead with supervised evaluation programmes and reference partners, not volume claims.

QuenchPod™ — Concept-stage technology23 / 27

Speaker notes

  • The schedule is a planning assumption and depends on supplier, test-facility and certification lead times.
  • Phase 1 prioritises S and R demonstrators; later phases expand the platform after evidence exists.
22 / 27 — Development timeline
QuenchPod logo

QuenchPod™

Remote suppression. Rapid deployment. Safer firefighting.

Concept enquiries

Amari Campbell

amaricam86@gmail.com+353 85 168 7167

Concept-stage technology. Performance and applications subject to engineering, testing, regulatory review and certification.