23 / 27 · IP and programme risk

Current slide

Defensibility

Protect the architecture. Retire the risks.

IP roadmap

  • Priority filing before any further public disclosure
  • Novelty and freedom-to-operate search after filing
  • PCT filing at 12 months and selected national phases at 30 months
  • Trade marks for QuenchPod™, Network™ and Clicker™; design registrations for visible hardware

Certification takes longer or costs more

Engage the test house during Phase 1 and reuse evidence across the common platform.

Agent partner will not warrant the charge

Develop with a certified formulation partner from the first bench programme.

Dense thrown-device prior art

Anchor claims to the physical discharge architecture, installed system and control layer.

Conservative procurement cycles

Lead with supervised evaluation programmes and reference partners, not volume claims.

QuenchPod™ — Concept-stage technology23 / 27
Elapsed00:00:00

Next

The budget

Development cost structure

Line itemScopeEstimate
Engineering & designMechanical, materials and dispersal system design across five sizes$220k – $450k
Prototyping & toolingIterative prototypes, soft tooling, assembly fixtures$120k – $300k
Agent supply & handlingFoam, gel, powder and wet chemical concentrates for test programme$30k – $70k
Live fire test programmeTraining-centre burn facilities, instrumentation, crews$150k – $350k
Certification & regulatoryIndependent test house, standards compliance, legal review$80k – $200k
Drone & aerial integrationWILD and AIR carriage, release and flight trials$180k – $400k
IP & programme managementPatent filings, programme staffing and contingency$150k – $320k
Total programmeConcept through certification to first production run$0.9M – $2.1M

Benchmark estimates built from published 2026 cost ranges for hardware engineering, injection-mould tooling, live fire testing, independent certification and PCT patent filing. They are planning ranges, not quotations — each line is to be confirmed with supplier, test-house and certification quotes before contract.

QuenchPod™ — Concept-stage technology24 / 27

Speaker notes

  • The patent application is drafted but unfiled, so disclosure discipline remains essential.
  • The moat is intended to cover release architecture, installed addressable systems, remote delivery and methods.
  • These are programme risks with planned mitigations, not solved problems.
23 / 27 — IP and programme risk
QuenchPod logo

QuenchPod™

Remote suppression. Rapid deployment. Safer firefighting.

Concept enquiries

Amari Campbell

amaricam86@gmail.com+353 85 168 7167

Concept-stage technology. Performance and applications subject to engineering, testing, regulatory review and certification.