QuenchPod logoQuenchPod™
OverviewModelsSystemSpecPricingPrototypeDemoDeckFilingContact

QuenchPod™ investor deck

24 / 27 · Development cost estimate

Current slide

The budget

Development cost structure

Line itemScopeEstimate
Engineering & designMechanical, materials and dispersal system design across five sizes$220k – $450k
Prototyping & toolingIterative prototypes, soft tooling, assembly fixtures$120k – $300k
Agent supply & handlingFoam, gel, powder and wet chemical concentrates for test programme$30k – $70k
Live fire test programmeTraining-centre burn facilities, instrumentation, crews$150k – $350k
Certification & regulatoryIndependent test house, standards compliance, legal review$80k – $200k
Drone & aerial integrationWILD and AIR carriage, release and flight trials$180k – $400k
IP & programme managementPatent filings, programme staffing and contingency$150k – $320k
Total programmeConcept through certification to first production run$0.9M – $2.1M

Benchmark estimates built from published 2026 cost ranges for hardware engineering, injection-mould tooling, live fire testing, independent certification and PCT patent filing. They are planning ranges, not quotations — each line is to be confirmed with supplier, test-house and certification quotes before contract.

QuenchPod™ — Concept-stage technology24 / 27
Elapsed00:00:00

Next

The budget

Cost by model and phase

Per model

QUENCHPOD S$90k – $180k

Personal / early-stage. Smallest shell, wet chemical + ABC powder

QUENCHPOD R$150k – $300k

Vehicle & rescue. Fluorine-free Class B foam and cooling water

QUENCHPOD X$200k – $420k

Structure & industrial. Class A CAFS, largest certification load

QUENCHPOD WILD$180k – $380k

Wildland. Gel and long-term retardant, drone carriage trials

QUENCHPOD AIR$310k – $820k

Aerial. Aircraft carriage, release and aviation approvals

Per phase

Phase 1 · Months 0 – 9$250k – $500k

S and R demonstrators, agent partner trials, first live burns

Phase 2 · Months 9 – 24$400k – $900k

X development, full test programme, certification submissions

Phase 3 · Months 24 – 36+$300k – $700k

WILD and AIR, production tooling, first manufacturing run

The ask

Phase 1 + Phase 2 requirement$650k – $1.4M
Opening tranche sought now$250k – $500k
Full programme to production$0.9M – $2.1M
QuenchPod™ — Concept-stage technology25 / 27

Speaker notes

  • Every line is a benchmark range, not a supplier quotation.
  • The total covers concept through certification and first production, including tooling, live-fire work and legal/IP costs.
24 / 27 — Development cost estimate
QuenchPod logo

QuenchPod™

Remote suppression. Rapid deployment. Safer firefighting.

Concept enquiries

Amari Campbell

amaricam86@gmail.com+353 85 168 7167

Concept-stage technology. Performance and applications subject to engineering, testing, regulatory review and certification.